HOME


NEWS

 

EXAMPLES

 

ONE FAMILY HOUSING

 

HOUSE MODELS

 

MORE INFORMATION

 

SITEMAP

 
 
 
 
 
 
 

IMPRESSUM

 

 

HIGHLIGHTS

YRS BEFORE

 

ONLY PICS .

.. AND BACK

 

HOUSE BUILDING AND ENERGETIC RENOVATION (ONLY GERMAN)

 

KUBUS

STANDARD

 

OFFICE PRESENTATION

 

 

PARTNERS

 



(THIS SIDE SLOW)


ONLY PLANS .

.. AND BACK


BUILDING. SPECIFICATIONS    

(ONLY GERMAN)


MEDITERRAN

BAUCONT. - NORD. HOLZH.


CURRICULUM VITAE

 


CONTACT

 

       

FOTOS PLANS

PROJ 263  +  269

  FOTO SEQUENCES REFERR. TO HOUSE CONSTRUCTION  

NEON - PDH

NAEFH - SKANDIN. HOLZH.

 

PRODUCTS AND FEES

 

   
           

COMFORT HOUSING - SENIOR APPROPRIATE

 

LANDHAUS

EXTRAVAGANCE

       


PRODUCTS AND FEES



ACCORDING TO

 

HOAI (GERMAN REGULATIONS ON ARCHITECTS AND ENGINEERS FEES)

 


 

1. We apply German Regulations on Architects and Engineers Fees, reduced in up to 30%,  resp. their equivalents in the country of suministry of our products, in case that it is required by the local authorities. Offers will be given in several regulation-related means and according to financial business managemant rules and calculations.
2. In other cases or when the preceeding #1 is not applied for legal reasons, the hereby presented products and fees are applied.
3.
The hourly rate is fixed in 135 €.

4. The presented fees are applied nettos, adding sale taxes, if required.

   

ACCORDING TO

 

CONTRACTUAL ETAPS

 

THE PRODUCTS

 

A)

Projects  

 

A1)

 

 

Preliminary studies, consisting in acquiring the necessary dates to develope the project and presentation of outlinings to the client.

 

A2)

 

 

Preproject, contains the presentation of plans, descriptions and calculations of possible solutions to the client and to the authorities. They conduce to the elaboration of the definitive project.

 

A3)

 

Project and presentation to the authorities for construction permits.

 

 

 

B)

 

Preparations for Production  

 

B1)

 

Elaboration of the Construction Documents (Plans).

 

B2)

 

Elaboration of the Construction Documents (Specifications and quantities).

 

 

 

C)

 

Site Direction

 

C1)

 

 

General direction in site, execution control by means of coincidence with the permit plans, the norms and time and cost plans, as well as no technical coordination of contracters

 

C2)

 

Site engineer incl. general direction

 

   

THE FEES

 
 

 

The fees for etaps A+B are given in the following table, according to the complexity of the project. You may take 1,00 € as 1,10 US$ for projects out of the €-zone. Minimum fees are 12000 € for a complete project. Fees for etap C are a basic 15,00 €/m2 VA (Vending Area), minimum 1500 €, additionally hour-based fees (visits to the site and authorities) or as a percentage of the construction costs. Additionally, VAT will be charged.

 

   

m2 VA 

 

€/m2 VA from - til

 

  Basic m2
VA
Basic fees
from til in €
additional fees/m2
from til in €
til 250 110 12000 bis 15000 115,00 - 150,00
251    - 500 251 22500 - 32500
70,00  - 110,00
501   and more 501 45000 - 57500
50,00 - 65,00
   

Fees   are   distributed

 

according   to   this  formula:

 

A)

 

Projects  

 

A1)

9,0 %

A2)

23,0 %

A3)

27,0  %

 

 

B)

 

Preparations for Production

 

B1)

12,5 %

B2)

8,0 %

   

C)

 

Site Direction

 

C1) Generally

 

C2) Generally

 

20,5 %

 

C1 by 1,5

 

Berlin and Brandenburg and

special cases (Only site inspection acc. to law)

Visits to the site or authorities will be remunerated with a minimum of 175 € for a maximum of 2 houres incl. journeys, additionally 135 € for each exceeding initialized hour. The hourly rate is fixed in 135 €. Viatics will be charged.  

 

   

Division by subprojects

 

(professional areas) as follows:

 

1. Architecture:

50 %

2a. Installations :

2b. fire protection:

15 %

15 % aditional

3.. Structure incl. Thermical and Acoustic Protection:

35 %

 

 

In case of no requirement of special installation projects, the architectural project is a 65%

 

 

In case of parcial execution of products, fees are raised in 10 percentage points, due to the coordination costs.

 

 

In case of contraction of only one or two professional areas, corrseponding fees are raised in 10 percentage points, due to the coordination costs.

 

 

Repetition of projects means a fee reduction of the etaps A+B in 60%. More than 20 repetitions will be submitted to a special fee agreement.

 

 

Cases of subcontraction of products by the client are treated in the following way:


- Reduction of fees will be 15 % if the client bares civil responsability for the product


- Additional reduction of 10 % is applied in case that the client gives equipment and working area to our disposal

 

Observation


This document is valid til 31.12.2019

 

 TOP