HOME


NEWS

 

EXAMPLES

 

ONE FAMILY HOUSING

 

HOUSE MODELS

 

MORE INFORMATION

 

SITEMAP

 
 
 
 
 
 
 

IMPRESSUM

 

 

HIGHLIGHTS

YRS BEFORE

 

ONLY PICS .

.. AND BACK

 

HOUSE BUILDING AND ENERGETIC RENOVATION (ONLY GERMAN)

 

KUBUS

STANDARD

 

OFFICE PRESENTATION

 

 

PARTNERS

 



 


ONLY PLANS .

.. AND BACK


BUILDING. SPECIFICATIONS    

(ONLY GERMAN)


MEDITERRAN

BAUCONT. - NORD. HOLZH.


CURRICULUM VITAE

 


CONTACT

 

       

FOTOS PLANS

PROJ 263  +  269

  FOTO SEQUENCES REFERR. TO HOUSE CONSTRUCTION  

NEON - PDH

NAEFH - SKANDIN. HOLZH.

 

PRODUCTS AND FEES

 

   
           

COMFORT HOUSING - SENIOR APPROPRIATE

 

LANDHAUS

EXTRAVAGANCE

       


HIGHLIGHTS YEARS BEFORE






2012




JUNE 2012
26.06.12

THE SECOND NEUENHAGEN HOME GOES STRAIGHT AHEAD, THE FLOOR HEATING AND COOLING TUBES AND THE CONCRETE TO BE EXECUTED THIS WEEK

The perimeter thermical insulation and the reinforce steel bars a terminated, as well as certain rough electrical installations. This week the heating and cooling tubes will be installed, to this month's end the concrete.



THE TUBES FOR THE COMPLEX WATER RE-USE SYSTEM ARE NOW CONSTRUCTED INTO THE BED OF THE SLAB UNDER CONSTRUCTION

On this stone recycling bedded ground, the climate activated slab will be constructed.



ALSO THE SECOND NEUENHAGEN HOME HAS BEEN BEGUN, GROUNDWORK IS NEARLY COMPLETED

On this ground, the climate activated slab will be constructed.





MAY 2012 25.05.12

PARTICIPATING AT THE BERLINER ENERGIETAGE 2012

LINK TO WEBSITE: www.berliner-energietage.de

For german-speaking people, the website is very interesting, a resume in german you may find on my page "NEUES", just a topic: German politics are now heading to change from bio masses to environment energies like wind, solar and earth warmth, as bio masses can't be produced in sufficient quantities to solve energy problems. Therefore increasing efficiency in heating and changing to electric based heating systems (combinated with environmental energy) is now focussed out as best way for future heating systems.



APRIL 2012 07.04.12

FROM OLD TO NEW - APPLIES TO WEEKEND HOMES, TOO

This weekend home has been converted to a modern style, with the help of our office: Found - redesIgned - rebuilt!

<--THAT'S HOW WE FOUND IT

<-- REDESIGN       <--RECONSTRUCTION

    <-- SO IT GOT TO BE



MARCH 2012 09.03.12

ANOTHER NEW OFH IN NEUENHAGEN, CLOSE TO BE UNDER CONSTRUCTION

This home was planned for a different lot and was now adapted to the present lot, soon to be constructed. In his variated form, this home was presented in april of 2011 as "NEWS". Here the actual form:



PARTICIPATING AT THE 3. CONSTRUCTION CHAMBER MEETING BERLIN-BRANDENBURG

This meeting was dedicated to energy efficient buildings, green buildings and isolation solutions, as well as their individual and global economic costs, as well as legal risks due to design and councelling mistakes in this area. This meeting took place at the construction site of the new Berlin airport and included a site seeing trip.







FEBRUARY 2012 24.02.12

NEW OFH DESIGNED FOR BERLIN

After long termed financing negotiations (2 years) the hereunder shown 220 sqm house will pass to the next step: Detailed redesign, permission documents and construction:

<GF <UF <FACADES


23.02.12

VISITING THE BAUTEC BERLIN

To garantize up-to-date performance, the visit to the Bautec in Berlin was very  interesting, most of all for the new heating and energy saving technologies. Soon there will be some new devellopments in our housing projects.




2011




DECEMBER 2011

LOOKING BACK PROUDLY ON 2011 - AND HOPEFUL FORWARD TO THE NEW YEAR 2012

 

After real consolidation in 2011, hopeful we can look ahead on 2012.

The economic activities of the office ar now based on equitiy, without any bank help - except for transitory items.  Due to this, a  trouble-free economic flow ist guaranteed in all our activities. More than, the transport system has been changed to all public available transport and with this costs have brought down to the lowest point, while flexibility has been maintaind, including an own city car facility.

The by now reached and even increased high professional performance, has been and will be continously improved by own studies and participating in seminaries and events. So - as every year - you may look forward to increasingly better products during the next year, too. That referres specially to energetic high performance and comfort leading and barrier free construction and reconstruction.



NOVEMBER 2011 8.11.11

SIMPOSIUM ON FLAT ROOFS AT BAM (FEDERAL INSTITUTE FOR MATERIAL RESEARCHES)

The BAM hold a simposium in cooperation with some private firms, where aspects such as technics, norms and legal items were highlighted, specially as what to referres to encounters between roofs and other neighbored construction parts.

This simposium served to us architects and engineers as a refreshing course, as well as profoundization and ampliation of knowledge, hereby improving service performance for our clients.




12.11.11

ADDITIONAL DOMAIN

From this moment, an additional domain has been installed: www.karlheinzurban.eu. The further domain www.karlheinzurban.de will be on air very soon on a different webhoster. In a very arbitrairy way, the former webhoster with the Magenta-T shut down the existing web direction, as something like a revange for having changed the fone provider, though I had the tough information, that there were no change in behalf of the webhosting. This surprisingly and without any foregoing information.


03.11.11

PARTICIPATION IN AN AIT-SYMPOSIUM ON ACUSTICS


During this one day symposium, existing knowledges on space and construction acoustics were refreshed, newest scientific investigations included. To this problematics, the technological answers incl. material responses were shown.





JUNE 2011 PARTICIPATION IN THE EVENT



This event treated 2 big areas: On one hand the filosofical bases of exercising architecture and engineering on the background of the actual ecological and economical situation, as well as the consequences for designing of buildings, formal and technical meanings. This presented by buildings and projects of architectural professors that have own offices working on that items.

On the other hand, new products and procedures,
that meet this points, were presented by the co-sponsoring firms.




MAY 2011 SEMINAR ON NEW DIN 18040-1 FOR CONSTRUCTION FEATURES FOR HANDICAPPED - THEY MEET OUR CONCEPT FOR COMFORT HOUSING

During a seminar on the new DIN 18040-1, regulating construction items for handicapped, was made clear, that from now on handicapped will be having the same possibilities to use a building as no-handicapped. That means, that not only wheel chair users, but all handicapped persons like seniors, blind etc. persons will have perception of signals, alarms etc.

This new norm is valid for publich buildings, but will be followed soon by the new DIN 18040-2, valid for housing, and will regulate minimal room spaces and other special living area aspects.

Our senior appropriate comfort housing meets a lot of the new planned items of this new DIN.





PARTICIPATION IN ENERGY FORUM




THE PAGE TYPENHÄUSER NOW SHOWS 3-D DISPLAYS OF THE HOUSES

On the page Typenhäuser, 3-D Displays have beeen introduced, which give a better idea of what these homes are like. On request, at may office or at your home we make more animations available.



APRIL 2011

NEW OFH NOW UNDER CONSTRUCTION, AFTER A LONG WINTER PAUSE

Here the first pictures of the construction in course of this first new home we begun after the long winter pause. Remember the first design, next the 3-D-Display and then the constructiomn fase of foundactions. Next week we will terminate rough constructions.







NEW OFH, DESIGNLINE NEON, WITH SPECIAL ITEMS


This home offers widely open spaces nearly like a PDH - free entrances without doors to any room, without the guests bath room. Nearly all the walls go up to 2,25 mtrs, while the ceiling is 2,50 mtrs, showing a fluent internal room impression. Sleeping areas, so private as for guests are seperated by sliding curtions from the walking and fitness areas. The following pictures show the idea. The private shower space and bath room is separated from the private bedroom by glass panels and have a walk-in-closet. All massive walls will be covered by plaster without any tiles, only the massive separations of the bath rooms will be covered with natural stone, as well as the TV and chimney wall in the living area. Coulored industrial floors close the neat and clear impression of this house.

 



JANUARY/FEBRUARY 2011



ENERGETIC RECONSTRUCTION - BETTER PERFORMANCES FROM NOW ON


From now on - and after having experimented for more than a year the new service area "Energetic and general reconstruction", as well as due to the more restrictive norms - the former high standard has passed to be the normal standard, while the new hifgh standard has been fixed in what is named KfW 70, means 70% energetic needs for a referenced minimum standard home.


The insulation standard for new constructions hav'nt changed, and is still at KfW 70


More Information under HOUSE BUILDING AND ENERGETIC RENOVATION (ONLY GERMAN).



2010



NOVEMBER 2010

ENERGETIC AND GENERAL RECONSTRUCTION OF AN OFH IN NORTHERN GERMANY


Even smaller contracts are fulfilled by us, such as this reconstruction of an OFH, incl. energetic. This home from the early 50ies, though renovated partially in the 70ies, suffers from bad comfort and room distribution, as well as a highly unefficient energy performance, due to very poor wall, roof, and soil insulation (24 cm exterior brickwork), and an old oil fueled heating system with radiators.


The renovation consists in the installation of a high efficiently gas heater with soil warming system incl. insulation, a solar heater and a chimney with water heating system, all these working together for heating and warm water. Additionally, the exterior walls will receive a 14 cm exterior insulation with exterior brick construction, to reinstall the old facade, as well as 24 cm roof insulation and new tiles. Windows will be changed from 2 to 3 glasses.


At this moment the house needs 310 % of the energy permitted for a new house, than it will need 90 %, what means a substantial reduction of more than 2/3 in heating costs, while the reconstruction costs are around 85000 €, where the german governments give a partially refund resp. low-interest-loan for about 50000 €.


        


The reconstruction towards a comfortable, functional and energetic high quality OFH:

Floor plans                   and a handdrawn sketch

    

OCTOBER 2010

NEW HIGH LEVEL OFH DESIGNED - CONSTRUCTION WILL BEGIN BY SPRING 2011

Again, a high level, energy saving home has been designed, to be constructed from spring 2011 to august of the same year.

New plans for more houses will be designed during the next weeks. We will be informing about it.

Here under illustrations  of the design phases, beginning with sketches, passing to clear designs, and then to construction documents, richly drawn with effective details.

This construction documents will be adapted to the client's needs during the whole construction phase, using the the design-build-method.


SEPTEMBER 2010

PARTICIPATION IN BERLIN HOUSING CONGRESS TO ENERGY EFFICIENCY I NEW TECHNOLOGIES I LOGISTICS



Topics:
- Energy efficiency in buildings
- New dimensions for ligthweight constructions
- Logistics optimization of site processes
- Foreward view - what kind of living spaces do we need in the future?

Under sponsoring of the hereunder shown firms, topics were prepared that show a future with energetic high performing comfortable living spaces, as well as new constructions  and building reforming constructions. That due to 2 reasons: The legally required energetic savings on one hand, and the adaption of living spaces for older generations and their request of barrier free and comfortable living, on the other. To reach these goals at a low cost, it's essential the use of every day more standardized and high technical levelled materials, as well as much better site logistics, to reduce time costs on this hand.




AUGUST 2010

THE NEW MODEL "POST DESIGN HOMES" IS NOW AVAILABLE AND CAN BE OBSERVED UNDER
NEON.

The new model is characterized as a very simple and clear cubic volume (which, of corse, can be curved). Within this volume are areas  available for individual planning of rooms and spaces. Certain limits are given by the paired windows, installed in an established rythm. During the pre design process, the client can introduce certain changes, as well to the window distribution, as to the volume. A pdf-file is available for a basic ground floor of about 145 sq mts, under the NEON button.

As anounced in july, the costs will be fixed incl. our assistance til the conclusion of construction. In the interior of the house, by design-build-method, spaces will be organized, while the client buys and builds - or even give the orders to my office - the materials, services, and finishings. Full assistance of my office will be guaranteed until the building is concluded, as usual.

Under the button
HAUSBAU costs will be given (site only in german available), under BAUBESCHREIBUNGEN the specially proposed items for this model (only in german available).

Herunder a proposed typical facade of this new model:




MAY 2010

















FEBRUARY 2010

PARTICIPATION AT THE "BERLINER ENERGIETAGE" - TRENDS



This years partcipation at the "Berliner Energietage" brought a lot of knowledge on what future trends are to separation of tecnologies, on one hand the installations, and on the other the closing of the building with a duration of 330-50 years, what means efforts now to construct termic insulation for the future, as no big innovations are in sight in this area. Really is necessary despite, change installations in shorter terms, as by 15-20 years. This will be from now on in the low temperature range, what is yet to be handled by the energy distribution installations. The warmth producing installations will need to be adapted time by time, due to always stronger regulations. Mechanical ventilation with energy recuperation prevents free ventilation with heating costs and humidity in the building. Good services will bring controlling by BUS-systems, up to 15% of energy saving, well in the heating and warm water area, as in the electrical servcies (lights etc.).

VISIT TO THE BAUTEC 2010


During the visit to the BAUTEC 2010 - construction fair in Berlin - a lot of informing talks as to new construction materials and energy supply were held, specially to what recycled materials and alternative energies referres.

Of great interest this year were the use of wooden materials used as insulation materials and sponged  recycled glass as base material of slabs, working at the same time as insulation and structural. There will be own studies as to the use of these materials in OFH planning and building.

There were some new items to using alternative energies, but no complete new ideas. That means, that our own way to reduce energy waste in OFH was confirmed.


2009



NOVEMBER 2009

 

 

 

 

 





ASSISTING TO MEETING ON SENIOR HOUSING

 

 

 

This important event evaluated the actual advances on this type of housing, and established the basic topics of the design of tecnical equipments (spaces, minor tecnologies as elimination of barriers and door widths for wheel chairs etc.), all these items aplicable to comfortable living from this point on with a look to the future, as well as implementation of BUS systems for auxiliar electronic home functions. While the above mentioned technical equipments are already in our catalogues as senior housing appliance, the BUS systems will be available from now on, with a cost of 100 - 200 €/m2 of living space, according to the needs of the client. Soon, we will offer a catalogue with detailled descriptions of moduls and their costs.

 

OCTOBER 2009

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 

 

 

 

PARTICIPATING IN THE EVENT "TRENDS OF BUILDING INTERGRATED PHOTOVOLTAIC"

 

Information talks to the following aspects:

 

- Formal design: additive, collage and integriated installation of photovoltaic elements, the strong actual trend is the last one, facilitated by the devellopment of flexible silizium based thin modules

- Technical design: solutions have advanced a lot (efectivity between 6 percent amorph silizium based thin modules and 19 percent in monocristalline modules), but the integration to legal building norms has not advanced this far, they are about 5 years behind technics. That makes rutinary application of photo voltaic difficult.

- The future: Integration of photovoltaic in the energy management only has chances in OFH, when - at the same time - the formal design integration of low luminar cost elements (LED) is formented, by the way that better and clearer industrial and legal standards as well as more flexible application technologies and lower costs take over. For buildings to plan in the near future, prevention for later use of photovoltaic can be made by designing big surfaces without windows or other means, maybe inclined, in direction to the south (e.g. roofs, like for solar water heating). Additionally, spaces and technical devices for controlling of energy transfers and maybe storing (accus) are necessary.

- Technology Transfer: On the Stadt Berlin website, informations are given (only german) for small german investors to the TSB Transfer BONUS

 

Hereunder fotos from the event, left to right: Official Invitation - reading information tables - Impressions from the Site - Model of thePlanned Investigation Site

 

 

 

AFTER RESEARCH IN FORMER BUILDINGS, AN ADAPTED TO OFH DESIGN-BUILD-METHOD IS INTRODUCED

 

The new design-build-method, specially adapted to OFH, will be used from this very moment in all houses and permits latest decisions on the design of several parts of the construction, to introduce desired changes to the works in execution. This normally is improvised and leads to delays and cost elevation for the building. With the new method, the client has the possibility to to introduce during the execution of the works certain changes up to defined section closing points, in a normed way, without dangering the final execution time or rising cost levels for restructuring of built parts. That means more comfort for the clients, while fitting execution time and costs to the pre-established levels.

 


MAI TO AUGUST 2009

 

 

 

 




 

 


 

 

 

 

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NEW COOP-CONTRACT WITH TYCONHOMES AND

ANOTHER NEW HIGH LEVEL ENERGY SAVING HOME UNDER CONSTRUCTION - AS NAEFH!

From the dream to reality:

 

  The very beginning - a dream

 

  

The designed plans---^

That´s the result from the may dreams:

 

 

ANOTHER NEW HIGH LEVEL ENERGY SAVING HOME COMPLETED

The brick-built home is terminated, as well as the above shown NAEFH



MARCH 2009

 







 

 

 


NEW HIGH LEVEL ENERGY SAVING HOME TERMINATED

 

A new home with hogh energy saving standard and finishings was terminated and handed to his owner...

 

2008  

JULY 2008

 

 

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


ENERGY SAVING HOMES BUILT

   

 

 

 

 

 

MAY 2008

 

 


 

 

 

PARTICIPATION IN BERLIN ENERGY SAVING DAYS

 

To improve the eco performance of planned one family housing at this office, exitful participation as hearer in the Berlin Energy Saving Days

was fulfilled.

 

 

MARCH 2008

 


 




 

 

 

 

 

 

 

 

 

 

 

 

IN FEBRUARY: PARTICIPATING IN A CONCRETE SEMINAR

 

On 07.02.08 a concrete seminar took place at TU Berlin, sponsored by CEMEX Deutschland AG and InnovationsZentrums Bau Berlin e.V., in which I partcipated (center of picture) and where about 400 building designers were informed as to „Innovations in concrete materials“.

 

 

FEBRUARY 2008

 

 


THE NEW HOUSE MODEL (DESIGN LINE) SIMPLEX

 

As additional model in the low budget area, the new design line SIMPLEX has been integrated in the design line Kubus.


2007

 

OCTOBER

 

 

 

 

 

 

NEW AREA OF PRODUCTS WEBDESIGN - NEW ALIGNMENTS FOR BUILDING DESIGN

 

Recreation of the whole website for better performance: better style and more readable; presented by our now entering in production webdesign department. Also, the OFFICE PRESENTATION and CURRICULUM VITAE sites has been renewed, after a long intense auto studies and renovation fase from 2006 til now. This will be a continuos way of design and improvement now, and shows it's effects already in daily design labour, what will be reinforced and more obvious in a near future.

 

SEPTEMBER

 

 

FROM 01.09.07: NEW CONTACT OFFICES IN BREMEN AND KLOSTERFELDE NEAR BERLIN

 

This offices are for direct contacts for german customers of one family housing and small buildings.

AUGUST

 

NEW DETAILS SIDE FOR DESIGN LINE STANDARD - NEW WEBSITE STYLE - LOTS OF NEW PICS

 

JUNE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHANGES IN HOUSE CONSTRUCTION COSTS

 

In the first half year of 2007 constructions costs have risen, specially technical items. Therefor, costs of certain items described in the HAUSBAU page, had to be adapted.

 

ANNOUNCED NEW ECO HOUSE IN THE WEB

 

As shown above, the announced new eco house in the design line NEON AVANTGARDE is hereby presented.

 

  

 

  

 

DEVELLOPMENT OF A FORMER CONSTRUCTION SITE (VILLA MAIENSTR.)

 

       

There are 3 moments, from left to right: Situation found in july 2004, opening for terrace door in october 2004. After that, the completion of the works went to the hands of  collegues, due to that the here contracted static and architectural planning aid, as well as constructive site direction were completed. The last foto was taken now, short before works are completed, and shows the well done insertion of a new architectural and constructive element in a building from the 19. century sixties.

.

APRIL 

 

 

 

 

 

 

 

 

 

 

 

 

 

HOUSES FINISHED BY CLIENT

 

The design lines KUBUS,  STANDARD and NAEFH are now available as "Kostenobergrenze" based on a reduced product catalogue (BUILDING. SPECIFICATIONS for Finish Scale I and II).. The costs for Finish Scale I are 200 €/m2 (KUBUS and STANDARD), resp. 500 €/m2 under "Kostenobergrenze",  for Finish Scale II 100 € (KUBUS and STANDARD), resp. 300 €/m2 (NAEFH) under "Kostenobergrenze".

 

IMPORTANT  INFORMATION ON GUARANTIES FOR ONE FAMILY HOUSES

 

This information is important for german housebuilders, because it is on german laws. You may read it in german only for cases of house construction in germany.

 

REPORT IN THE DAB

 

In the german architect's magazine DAB, month of april, pages 55 to 57, an article on my professional life in Venezuela was printed.

 

JANUARY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NEW PLANTS

By now, the anounced specially designed plants in single plant houses for seniors are presented, shown in the DESIGN LINES "Kubus", "Standard" and "Neon", DESIGN GROUP "Tradition", 2 models of either "Compact" and "Classic" . Similiar designs are available for all other DESIGN LINES and DESIGN GROUPS. There are building specifications available in german.

  

  

 

 2006

 

 

SEPTEMBER

 

 

 

NEW JOINT VENTURE FOR CONSTRUCTION OF NORTH AMERICAN HOMES CELEBRATED

With Tyconhomes gGmbH, now established in Germany, a joint venture agreement has been signed recently and begins to work this month of september. With this new partner american wood constructions of any type incl. OFH will be less complicated.

 

MAY

 

 

 

NEW HOUSES

From now on, 25 basic housetypes with uncounted variations are available. Specially new are variations of a Classic 120 m2 house from the design line Standard, shown as well in Tradition as Avantgarde style in design lines Kubus, Neon, and Mediterran.

 

APRIL

 

 

 

 

ENQUIRY

A client enquiry has shown that till this moment, after having received a great part of answers, within a range from 1 (best note) to 5 (badest note), the service has been qualified as an 1,6. A 25 % found it better, a 63 % mostly as expected and only under 12 % worse served than expected.

 

2005

 

 

SEPTEMBER

 

 

NEW DESIGN LINE "MEDITERRAN"

The new Design Line "Mediterran" is presented

 

 

NEW OFH's BUILT

In cooperation with a Contracter, three specially designed OFH's were bulit recently:

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 NEW DESIGN FEATURES PRESENTED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2004

 

 

NOVEMBER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NEW DESIGN AREA

After having initiated the ampliation of technical design areas, as well as ampliation of design area for high level housing and design and construction of building reconstruction, expectations for sales and profits have gone up to about of 80% resp. 70% of what were the annual dates for 2003. That means a slightly better performance than that expected in july this year. Here fotos of a "Gründerzeitvilla" now in reconstruction, technical design and supervision on my hands , architecture and general supervision in cooperation with Arch. Schweitzer.

 

       

 

JUNE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

By june 1st, a new north american home has been terminated in Berlin, in co-operation with North American Homes Europe.

 

 

FEBRUARY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

New Northamerican One Family House

 

A new northamerican one family house has been completed. It contains various interesting items, such as pool und whirlpool area, two car garage and heigth to roof in the living an entrance zone, and more. Open house took place on 22.02.2004.

 

2000 - 2003

 

 

 

NOVEMBER 2003


One family housing specially for seniors and handicapped persons

From december one family homes will be desgned specially for seniors and handicapped persons if wished (stepless floors to any place incl. terraces, door width >1,00 m, shower suitable for wheel chairs etc.).

 

JULY 2003

From the 1st of july, inscription as Civil Engineer in the Engineers Chamber of Berlin (Baukammer Berlin) has been concluded. That is to provide better and more professional services to the client.

 

JANUARY 2003

 

Now available information (links in Complete Curriculum) about the universities visited during studies.

 

OCTOBER 2000

 

New system presented for planning and construction for one family housing
 

In Venezuela a new steel system for planning and construction for one family housing is presented, that provides moduled construction and buying to the middle class purchaser. This system includes all possibilities from the purchase of a basic module to turn key solutions in any quality option, passing by the possibility of aided self construction. By the beginnings of 2001, a model house will be constructed.

Typicalized material independent housing system

 

Planning work for the typicalized material independent housing system has been concluded to the point the system can be operated in Germany and abroad. 

 

JANUARY 2000

 

URBAN HABITAT C.A. reactivated

 

In Venezuela, URBAN HABITAT C.A. is reactivated to provide the german head office with design and drawing services.

 

 


TOP